Our washroom refurbishment project process

Undertaking a washroom refurbishment can seem like a daunting task, however we’re on hand to guide you through the process. A washroom refurbishment should be stress free, from start to finish. Here is our 10 step guide:

Contact options icons including a phone, email, and at symbol, with a hand cursor pointing to the email icon.

1

Schedule a no-obligation site survey either during or outside working hours.

Line drawing of a vintage camera with a large lens and handle.

2

Our friendly project consultant will meet you on site to undertake a survey of works.

Icon of a hand holding a paper with lines of text, a pencil writing on the paper, and a wristwatch on the wrist.

3

Receive your detailed proposal complete with plans and a quotation, within two weeks.

Purple arrow pointing downward and to the left
Icon of a person giving a presentation or lecture in front of a board with lines representing text.

In some cases, we’ll present the proposal to you in person at your convenience.

Line drawing of two people having a conversation with a speech bubble containing a check mark above them.

4

Review and confirm the proposal meets your expectations and agree our next contact date.

Icon of a document with lines of text, a checkmark inside a circle, and a pen signing or writing on the document.

5

Submit your purchase order for our project management team to begin scheduling.

Purple arrow pointing downward and to the left.
Line drawing of a floor plan with rooms, hallway, and entryway outlined in dark blue.

Confirmation of structural survey & building regulations requirements (where necessary).

Laptop with a flying bird logo on the screen

6

Choose your washroom colour and finishes - use our online visualiser or discuss with us.

Purple arrow pointing downward and to the right.
Icon of a document with lines of text, a checkmark inside a circle, a line graph, and a pen.

Sign your completed Order Acknowledgement and send it to us.

Icon of a construction worker wearing a safety helmet and vest, holding a tool or equipment.

7

Your Project Manager is assigned and will visit to final measure. Project lead time commences.

A maze puzzle game with interconnected pathways and blocks.

8

Project is programmed and documentation is issued with a guaranteed completion date.

A blue outline of a starting line sign with the word 'START' in the center.

9

Commencement on site. You will then receive regular progress updates for the duration of the project.

Graphic of a hand holding a package with a thumbs-up symbol on it.

10

Completion of project, handover, certifications, O&M manual issued.

Purple arrow pointing downward and to the left
Line drawing of a customer service representative or call center agent wearing a headset with a microphone.

You have direct access to our Aftercare service during the 12-month warranty period.

How can we help?

We’d love to hear about your project, submit your details today and we’ll get in touch with you to discuss.